Have you ever finished generating the manufacturing release package for the latest product design and then it occurred to you that something may be wrong?  Imagine, it’s Thursday night and you just finished a nice dinner with the family. Your daughter’s soccer team won and the Broncos are playing the Chiefs tonight. It will be great to relax and enjoy the game.

But did Katelyn say she put the final PCB design file in the release folder or in the project workspace? Better check that in the morning. Wait a minute, Danny said that the engineering team verified the schematic with the PCB design file in the workspace. But where did Katelyn put the latest PCB design? The manufacturing files could be all wrong!

Does this sound familiar?

Universal Issues

Managing manufacturing release packages has become a concern for just about all of us. If you get the manufacturing release package wrong, the boards will be bad and the costs will be significant.

So many things can go wrong:

  • Are the board and schematic in sync?
  • Are there procurement or lifecycle issues with any of the components used in the design?
  • Are we sure that the design files used to generate the outputs are the right ones?
  • Are all the required manufacturing documents in place?
  • Was the package fully validated before we released it?
  • Is my process repeatable?

These concerns are shared by companies of all sizes regardless of design complexity.

Some of the documentation pieces that are required can be quite complex in nature. The final viewable requirement could necessitate combining a set of standardized notes and images for sheet 1, panelized 4-up fabrication drawing for sheet 2 and a 1-up assembly at 2X for sheet 3. Just to make things a bit more interesting, the packages for manufacturing, test, inspection, purchasing, component engineering, documentation, procurement and PLM release have different file content and need to be placed in a different “pick-up” location on the corporate network. Producing the final output package at the end of the design cycle can be a daunting task.

Is there a BETTER way?

All these issues occur at the handoff point from engineering to manufacturing. They all take place at the end of the “Work-in-Process” (WIP) stage of a design cycle. ERP/PDM/PLM systems are very good at managing the content for manufacturing (e.g., software, mechanical and electrical). But they need to get the content from the design team. And it must be correct.

What if the design team could automate the generation of the manufacturing release package? What if the process was repeatable and reliable? You could be confident the package contents were accurate and deposited in the proper location. Design Data Management systems such as Zuken’s DS-2 product family were created for this. Our upcoming webinar called “Does the Release to Manufacturing Process Keep You Up at Night?” explores how to create and execute a repeatable manufacturing release process. Join us on Wednesday for the webinar, then you can relax a bit on Thursday night and actually enjoy the game.

Shawn Larson
Shawn Larson
Senior Technical Fellow
Shawn Larson is one of the technical leads for the DS product line working primarily on data management implementations. He helps customers to get the right design data in the right place at the right time. Shawn enjoys good jazz, classic rock, and all seasons in New Hampshire's White Mountains.
  • Blog
April 24, 2020
Working Remotely with DS – Design Data Management Tools

The world that we all live in has been changed by the Covid-19 outbreak. Stay at home orders and social distancing significantly impact the way we live our daily lives. Working remotely presents a whole new set of challenges for engineers and the companies that employ us. We now work on company supplied-laptops that typically connect back to the corporate network through a VPN.

Read now
  • Blog
March 31, 2020
Tech Tip: Exporting Search Results

This brief video shows you how exporting search results to a CSV (Comma Separated Values) file works. A repeated support call topic is how to export a long list of search results, so we will cover that one, too. 

Read now
  • Blog
February 20, 2020
Tech Tip: Managing BOMs Through the Component EOL Cycle with Zuken’s DS-CR

Electronic components are constantly changing, causing parts to go EOL (End-of-Life) for various reasons: companies go out of business, component product lines change hands, old technology is updated with new. Electronic product manufacturers must be agile to keep their product BOMs (bill of materials) up to date and keep their supply chain humming. Fortunately for them, Zuken’s DS-CR customers leverage component and design data relationships to tackle the problem.

Read now
  • Blog
March 19, 2019
Tech Tip on the Circuit Block Manager

Modular circuit design allows engineers to create a set of electronics building blocks that can be reused and shared between products. The Circuit Block Manager facilitates reuse management and change control of a library of circuit blocks in a convenient and organized manner. This brief video shows how simple it is to use a hierarchical schematic containing circuit blocks as the basis for a modular circuit block library within DS-CR.

Read now