Resources by

Stay on the leading edge of PCB, electrical and data management technologies

23 results found
  • Case Study
November 07, 2019
Electroflight

As part of the Accelerating the Electrification of Flight (ACCEL) research initiative, Electroflight is aiming to set a new world speed record of more than 300mph for an all-electric aircraft, involving the creation of one of the most power dense flying battery packs in the world.

Read now
To support an ambitious technology roadmap, Electroflight selected Zuken’s E3.series to create electrical and fluid schematics for the ACCEL speed r...
  • Case Study
November 05, 2019
dB Broadcast
Case Study, db Broadcast
A veteran user of Zuken’s desktop PCB design software, CADSTAR, dB Broadcast’s products division has been trusting CADSTAR to support product deve...
  • Case Study
October 04, 2018
Olivetti
Case Study, Olivetti
introduces complex, IoT-enabled products with confidence by switching to CADSTAR
  • Case Study
October 24, 2018
Weidmüller
Case Study, Weidmüller, Ensure Your Business Responsiveness, Electro-Mechanical Cabinet Design, Configuration management
Upto 75% reduction in cabinet engineering.
  • Case Study
October 24, 2018
Kässbohrer Transport Technik
Case Study, Kässbohrer Transport Technnik, E3.cable, E3.panel, E3.formboard
achieves 60-90% reduction in electrical documentation turnaround for customer specific vehicle configurations
  • Case Study
October 24, 2018
Kellenberger
Case Study, Kellenberger, Options and Variants, Manufacturing and Service Documentation
~90% time saving to generate customer-specific schematics by implementing options and variants in E³.series.
  • Case Study
October 24, 2018
Bruker
Case Study, Bruker, E3.cable, Multi-disciplinary collaboration, Manufacturing and Service Documentation
raises documentation quality and design flow efficiency for precision instrumentation with E3.series.
  • Case Study
October 24, 2018
Stone Aerospace
Case Study, Stone Aerospace, Increase Productivity, Reduce Your Total Product Cost, Control Quality Through Automation and Verification
Reduce cabling design time by 12 weeks through using E3.series
  • Case Study
October 19, 2018
Emergency One
Case Study, Emergency One, E3.cable, E3.formboard, Wire Harness Engineering, Modular design
controls wire harness design complexity and slashes delivery lead times by using a digital design process.
  • Case Study
October 24, 2018
ATK
Case Study, ATK, Increase Productivity, Control Quality Through Automation and Verification, 3rd Party Integration
increases cable design productivity for space shuttle booster replacement by moving to a digital design process.
  • Case Study
October 24, 2018
ARM Automation
Case Study, ARM Automation, Increase Productivity, Product and process complexity
achieves two-thirds electrical design time reduction and increases project ROI.
  • Case Study
October 24, 2018
Alstom is adopting new modular methodology for electrical design
Case Study, Alstom, E3.cable, Increase Productivity, Modular design
Alsthom improves productivity and planning by adopting a modular methodology for electrical design.
  • Case Study
September 26, 2018
Renishaw
Case Study, Renishaw, Design Force, E3.series, ECAD/MCAD Integration, Multi-disciplinary collaboration, Increase Productivity, Verification and Validation
Better fit and impedance control for complex flexible PCBs in metrology instruments.
  • Case Study
December 19, 2018
Müller Martini
Case Study, Müller Martini, Increase Productivity, Options and Variants, Multi-site collaboration, ERP/PLM Integration, Modular design, Electro-Mechanical Cabinet Design, Multi-disciplinary collaboration
enhances variant and option handling and reduces manufacturing costs by moving to an object-oriented ECAD environment.
  • Case Study
October 19, 2018
Mecalac
Case Study, Mecalac, E3.3D RoutingBridge, E3.formboard, Special Vehicles, Change management, Product Development Process Reengineering, Multi-disciplinary collaboration
cuts the time taken to develop right-first-time cable harnesses for its heavy plant vehicles.
  • Case Study
October 19, 2018
Pantec Automation
Case Study, Pantec Automation, Increase Productivity, Ensure Your Business Responsiveness, Options and Variants, Modular design, Configuration management, Multi-disciplinary collaboration
cuts machine manufacturing turnaround time by around 50%, reduces product costs, and helps protect IP for its customers.