Resources by

Stay on the leading edge of PCB, electrical and data management technologies

25 results found
  • Case Study
November 15, 2018
Mecalac
Case Study, Mecalac, E3.3D RoutingBridge, E3.formboard, Special Vehicles, Change management, Product Development Process Reengineering, Multi-disciplinary collaboration
cuts the time taken to develop right-first-time cable harnesses for its heavy plant vehicles.
  • Case Study
November 12, 2018
Pantec Automation
Case Study, Pantec Automation, Increase Productivity, Ensure Your Business Responsiveness, Options and Variants, Modular design, Configuration management, Multi-disciplinary collaboration
cuts machine manufacturing turnaround time by around 50%, reduces product costs, and helps protect IP for its customers.
  • Case Study
November 08, 2018
BCA Leisure
Case Study, BCA Leisure, Special Vehicles, ERP/PLM Integration, Multi-disciplinary collaboration, Reduce Your Total Product Cost
Using E3.series to design and manufacture cable harnesses for caravans and motorhomes
  • Case Study
October 10, 2018
Krone
Case Study, Krone, E3.fluid, Industry 4.0, Data Management and PLM, Hydraulic, Pneumatic, Cooling and Lubrication System Design, Electrical Planning and Documentation, Wire Harness Engineering, ECAD/MCAD Integration, Special Vehicles, Manufacturing and Service Documentation
Krone Agricultural Machinery integrates ECAD, MCAD and ERP to enable integrated design and sourcing
  • Case Study
October 01, 2018
Endress+Hauser
Case Study, Endress+Hauser, Design Force, Increase Productivity, Modular design, Machinery, Product Development Process Reengineering
Endress+Hauser standardizes PCB engineering and production processes for industrial measurement products across distributed locations
  • Case Study
September 26, 2018
Toshiba
Case Study, Toshiba, PCB Design in Context, Verification and Validation, Multi-disciplinary collaboration
significantly reduce product size with 3D chip, package, board co-design.
  • Case Study
June 25, 2017
BAE Systems
Case Study, BAE Systems
BAE Systems uses CADSTAR to help reduce turret control computer wiring by 98%
  • Case Study
November 22, 2014
TEWS
Case Study, TEWS
TEWS significantly reduces development time and cost of complex high-speed PCBs using concurrent power integrity simulation.
  • Case Study
April 25, 2011
Malvern Panalytical
Case Study, Malvern Panalytical
enhance data collaboration between ECAD and MCAD, improving manufacturing data.