What Does Success Look Like for Your Project?

What Does Success Look Like for Your Project?

Menu

Visiting customers and viewing the results of a product deployment project is always an interesting experience. While as a vendor it is tempting to focus on the unique and visionary functionality of our tools, it is good to be reminded of the very different success perspectives of the senior managers and expert software users who use them every day. I was recently reminded of this insight during a visit to KRONE, one of Europe’s foremost producers of agricultural machinery, based in the rural town of Spelle in Northern Germany.

Supporting the product development process

More often than not, our customers are less interested in the core functionality of the software than the goals and objectives they need to achieve when using it. These are usually product development projects with deadlines, cost and performance targets, alongside project management and coordination efforts. So, success for our customers is only achieved if the tools are deployed in a way that supports the company’s product development process and its related requirements.

Impeccable harnesses

The interview started off with a tour through the KRONE’s ultra-modern manufacturing facilities, where workers are led through each assembly task by 3D digital instructions. I was then expecting to be presented with a high-level vision of the company’s sophisticated innovation process, and its requirements for the electrical engineering tools employed in its wire harness design process that would signify a successful project implementation.

While an impressive gallery of innovation awards testifies that KRONE has a sophisticated innovation process in place, in deploying Zuken’s E3.series the first sign of success came down to something much more down-to-earth. It was, in fact, the company’s senior management pointing out (unprompted) the impeccable execution of the wire harness on the first pre-series vehicle of a new product line that showed the deployment team had got it right.

Since the cable harness takes a long time to source, the engineering team used to have to build in ‘safety margins’ into their harness designs that they  concealed in the pre-series products by applying the odd extra loop during the assembly process. This time, no masking was necessary since it was a perfect fit!

ECAD, MCAD and ERP integration

The positive comments for the wiring on KRONE’s new BiG X 480 forage harvester – a 480 HP monster, crammed with the latest technology – proved the success of a process re-engineering initiative initiated by KRONE’s electrical engineering team. Their objective was to integrate electrical engineering, using E³.series, into an interdisciplinary electromechanical product development process. Or, in other words, ECAD, MCAD and ERP integration.

Krone-LogoWhile this project enabled many downstream results in areas such as sourcing, cost calculation, assembly and service documentation, the most tangible effect was that the detailed design of wire harnesses could be initiated much earlier. By having access to validated 3D geometric information, the need for assumptions and safety margins was eliminated in the design of wire harnesses.

The result: right-first-time execution of the wire harness in the first pre-series vehicle; streamlined collaboration with the wire harness supplier, with substantial cost savings enabled by the provision of fully specified and validated manufacturing information; and an unexpected pat on the back from senior management.

Read the full story in English or German

Find out more about E3.series

Klaus Wiedemann
Klaus Wiedemann
Marketing Manager Europe
Klaus Wiedemann is responsible for Marketing and Communications across Europe covering web content, public relations, and marketing programs. He works with product management, technical experts, and customers to align and communicate Zuken products solutions with market needs. Klaus is an avid reader of classic literature, but he also likes to tinker with old bicycles and motorbikes.
  • Blog
March 21, 2023
How to avoid errors with uncontrolled electrical design changes

System design engineers must balance the demands of time and cost efficiency as well as accuracy under tight deadlines. When projects require collaboration between distributed people and teams, communication issues can make collaboration a challenging issue.

Read now
  • Blog
March 07, 2023
Unlocking the Key to Seamless Data Migration of Electrical and Electronic Legacy Data

Electrical and electronic engineering and design data represent a valuable investment that should be used and reused as often as possible, for reasons of cost and productivity. For this purpose, Zuken offers a comprehensive portfolio of data migration tools and services, which have just been used to successfully convert 18,000 projects from Windmüller & Hölscher's legacy data to the latest Zuken technology in a 24-hour batch process with up to 10 processes running in parallel.

Read now
  • Case Study
February 10, 2023
Windmöller & Hölscher

Data conversion as a foundation for a future-oriented development process in electrical and pneumatic control technology. Zuken Migration Services converts 18,000 data records for Windmöller & Hölscher, the world market leader in machines and systems for manufacturing and processing flexible packaging.

Read now
Migrating 30 years of legacy data to Zuken E3.series via Zuken’s data migration services
  • Blog
January 30, 2023
Low voltage or over current, which are you?

Changing standard components in an electrical system is a common task but it entails a number of time-consuming checks that engineers must carry out to avoid trouble. For example, replacing a windscreen wiper motor may seem like a simple task, but what if the new motor is more powerful...

Read now