Resources by

Stay on the leading edge of PCB, electrical and data management technologies

18 results found
  • Press Release
August 03, 2021
E3.series 2021 Release makes Control Cabinet and Wire Harness Engineering Faster, Easier and More Dependable

E3.series 2021 from Zuken delivers enhancements for connector handling, 3D control cabinet design and ECAD/MCAD collaboration.

Read now
  • Webinar
November 24, 2020
The Digital Twin for Service and Assembly

Today's discussions about the digital twin are mainly focused on the areas engineering and production. What is often overlooked is on-site maintenance and customer service.

Watch Now
  • Press Release
November 19, 2020
Zuken and Electro Magnetic Applications Collaborate on EMI Reduction

Zuken Inc., and Electro Magnetic Applications, Inc. (EMA) have entered into a partnership to improve the accuracy of cable harness simulation models for complex electrical subsystems in aircraft and vehicles

Read now
  • Case Study
March 13, 2020
Hydro-Québec

Hydro-Québec simplified design process for power distribution network substations by implementing Zuken’s E3.series

Read now
Improves Power Distribution Substation Design Productivity by 100%
  • Webinar
December 05, 2018
Concurrent Design of Power Generation and Distribution Schematics and Panels

This webinar will cover the design of large electrical projects. A vital element of the design process is the tracking of nomenclature, device and cable functions, assignments and placement.

WATCH NOW
  • Webinar
November 29, 2018
Wire Harness Design Automation Basics 2

This webinar follows our first webinar “Wire Harness Design Automation Basics I” where we have seen the logical part of the design process. Now we will look at the physical part of the wire harness design process.

WATCH NOW
  • Webinar
November 29, 2018
Wire Harness Design Automation Basics I

This webinar covers the logical part of the wire harness design process consisting of creating the wiring diagram and the topology design.

WATCH NOW
  • Case Study
November 22, 2018
Kässbohrer Transport Technik

The Austrian manufacturer of vehicle Transporters, Kässbohrer Transport Technik, achieved a substantial improvement in process reliability in the generation of individualized assembly instructions and schematic documentation by implementing E3.series. Turnaround cycles for special projects were reduced by 60 to 90%.

Read now
achieves 60-90% reduction in electrical documentation turnaround for customer specific vehicle configurations
  • Case Study
November 22, 2018
Bruker

To improve the quality of its electrical documents such as wiring diagrams, and to raise its design efficiency, Bruker AXS GmbH Karlsruhe implemented Zuken’s E3.series at all stages. The manufacturer of X-ray analysis systems uses E3.series from concept and production to service.

Read now
raises documentation quality and design flow efficiency for precision instrumentation with E3.series.
  • Case Study
November 21, 2018
Stone Aerospace

Stone Aerospace faced the pressure of a tight schedule in designing a one-of-a-kind underwater autonomous vehicle (AUV). The time needed to design the wiring harness for the AUV was reduced by around 12 weeks and $20,000 was saved by using E3.series to automate many aspects of the design process, while integrating the logical and physical design on a single platform.

Read now
Reduce cabling design time by 12 weeks through using E3.series
  • Case Study
November 21, 2018
Emergency One

Specialist fire rescue and emergency vehicle manufacturer, Emergency One UK Ltd, uses E3.series software for its electrical harness design. This has enabled the company to produce wire harnesses to standardize the design and manufacturing process reaping, cost savings and reliability benefits, while also delivering flexibility through modular based customization.

Read now
controls wire harness design complexity and slashes delivery lead times by using a digital design process.
  • Case Study
November 21, 2018
Alstom is adopting new modular methodology for electrical design

After acquiring various companies around the globe in the 1990s, Alstom needed to integrate new elements into its international corporate structure in order to improve productivity and planning. This also meant creating a standardized software landscape that would cover all divisions of the group.

Read now
Alstom improves productivity and planning by adopting a modular methodology for electrical design.
  • Case Study
November 15, 2018
Mecalac

Mecalac designs and manufactures heavy plant vehicles for use in construction. Their vehicles – backhoe loaders, site dumpers and compaction rollers – are each offered in several variants. They all need to work in harsh environments.

Read now
cuts the time taken to develop right-first-time cable harnesses for its heavy plant vehicles.
  • Case Study
November 08, 2018
BCA Leisure

BCA Leisure designs and manufactures mixed power cable harnesses for almost every UK-based OEM of caravans and motorhomes. The company has been using E3.series for a number of years and recently started using E3.cable, part of Zuken’s E3.series suite, which is now heavily relied upon during the development of 100+ different prototype harnesses each year. This is followed by provision of detailed production drawings to the shop floor.

Read Now
Using E3.series to design and manufacture cable harnesses for caravans and motorhomes