Meet our People: Bob Prosser, Site Services Controller

Menu

Meet Bob Prosser. He joined Zuken in June 1981, in Tewkesbury, Gloucestershire, when it was still Racal Redac. He is a facilities manager with a passion for problem-solving and a part-time Father Christmas. Recently, he took some time out of his busy schedule to chat with me about his many years of experience at Zuken.

Meet-Our-People-Bob-Prosser-1-300x300I’m the Facilities Manager of our UK office and look after the building infrastructure, facilities, systems, and services. Facilities management is a challenging and dynamic field that requires technical and operational knowledge as well as communication and interpersonal skills.

Much of the work and projects involve external contractors and depend on good cooperation between different departments such as IT, HR, and Finance.

There’s no such thing as a typical day, which is why the role is so engaging. Every day can bring a new challenge, something to fix, a problem to solve, or something to plan. There’s probably not been two days the same since 1981! Perfect for someone like me with a passion for problem-solving, strategic thinking, and leadership.

Most Memorable Project

The recent refurbishment of the office building is the project that immediately springs to mind. The project involved a complete replacement of the HVAC system, heating, ventilation, and air conditioning, redesign of the UK sales area, and meeting room suite. The time frame was a real challenge for this project: all of the work was done after the pandemic lockdown was over and before employees returned to the office.

Beekeeper and Father Christmas

In my spare time, I keep bees. I started a few years ago with two hives I received as an anniversary gift after 35 years at Zuken. Fun fact about bees: they communicate by dancing! Their dance move is called the ‘waggle dance’. It’s not actually a dance move at all, but rather a clever way of communicating between themselves to tell their nestmates where to go to find the best source of food. It took the researchers at Sussex University two years to decode the waggle dance.

I also help run our local community hall and am a member of the management committee. I enjoy clay pigeon shooting with my son. And I’m busy every year around the end of November and into December when I dig out my red suit and hat and make appearances at primary schools and nurseries.

Lilli Schuetze
Lilli Schuetze
Content Marketing Manager
  • Blog
March 21, 2023
How to avoid errors with uncontrolled electrical design changes

System design engineers must balance the demands of time and cost efficiency as well as accuracy under tight deadlines. When projects require collaboration between distributed people and teams, communication issues can make collaboration a challenging issue.

Read now
  • Blog
March 14, 2023
Harness Design: How to connect MCAD and ECAD design tools into a consistent design flow

With E3.3DRoutingBridge and E3.3DTransformer Zuken provides a complete set of solutions for seamless data exchange for 3D harness routing designs bridging the gap between the MCAD & ECAD worlds.

Read now
  • Blog
March 07, 2023
Unlocking the Key to Seamless Data Migration of Electrical and Electronic Legacy Data

Electrical and electronic engineering and design data represent a valuable investment that should be used and reused as often as possible, for reasons of cost and productivity. For this purpose, Zuken offers a comprehensive portfolio of data migration tools and services, which have just been used to successfully convert 18,000 projects from Windmüller & Hölscher's legacy data to the latest Zuken technology in a 24-hour batch process with up to 10 processes running in parallel.

Read now
  • Blog
February 20, 2023
Sustainable Product Development

On our way to achieving sustainable product development, we ask ourselves one central question: how do we engineer products so future generations have enough resources to prosper? Up to four-fifths of a product's lifetime emissions are determined by decisions made at the design stage. Having all the tools needed to get those decisions right is essential for designing sustainable products that meet performance and quality requirements while using fewer resources across the entire life cycle.

Read now
  • Blog
March 21, 2023
How to avoid errors with uncontrolled electrical design changes

System design engineers must balance the demands of time and cost efficiency as well as accuracy under tight deadlines. When projects require collaboration between distributed people and teams, communication issues can make collaboration a challenging issue.

Read now
  • Blog
March 14, 2023
Harness Design: How to connect MCAD and ECAD design tools into a consistent design flow

With E3.3DRoutingBridge and E3.3DTransformer Zuken provides a complete set of solutions for seamless data exchange for 3D harness routing designs bridging the gap between the MCAD & ECAD worlds.

Read now
  • Blog
March 07, 2023
Unlocking the Key to Seamless Data Migration of Electrical and Electronic Legacy Data

Electrical and electronic engineering and design data represent a valuable investment that should be used and reused as often as possible, for reasons of cost and productivity. For this purpose, Zuken offers a comprehensive portfolio of data migration tools and services, which have just been used to successfully convert 18,000 projects from Windmüller & Hölscher's legacy data to the latest Zuken technology in a 24-hour batch process with up to 10 processes running in parallel.

Read now
  • Blog
February 23, 2023
Meet our People: Bob Prosser, Site Services Controller

Meet Bob Prosser. He joined Zuken in June 1981, in Tewkesbury, Gloucestershire, when it was still Racal Redac. He is a facilities manager with a passion for problem-solving and a part-time Father Christmas. Recently, he took some time out of his busy schedule to chat with me about his many years of experience at Zuken.

Read now