Holiday-Hours-6

Holiday Support Hours


Thank you for continuing to support and partner with Zuken USA through 2025.

As always, if there’s anything we can do for you, please don’t hesitate to reach out to your account manager or support manager. We encourage you to check our Community Support Page for tutorials, discussions, and more support.

During the upcoming holiday season, our offices will be closed for a few days to allow our team members to rest and spend time with their loved ones. We will be back and ready to support you in everything you need starting Friday, January 2, 2026!

  • Zuken USA offices will be closed Thursday, December 25, 2025 through Thursday, January 1, 2026.
  • Hotline support will be available Friday, December 26 and Monday–Wednesday, December 29–31, while offices remain closed.
  • Standard services resume Friday, January 2, 2026.

Resources

Fat Truck off-road utility vehicle operating on rugged terrain
  • Blog
July 23, 2026
How Zeal Motor Reduced Development Time by 75% with Wire Harness Documentation Software
Customers, e3-series, Electrical & Wire Harness, Customer Success Story, E3.series, Electrical Design, Fat Truck, Harness Builder, Harness Builder for E3.series, Harness Manufacturing, Wire harness design, Wire Harness Design Software, wire harness documentation, wire harness manufacturing, wire harness production, Zeal Motor, Blog
PCB with green and red traces, resistance calculator, and trace factor callouts.
  • Blog
July 16, 2026
Tech Tip: Check PCB Trace Resistance with Ohmic Distance in CR-8000
cr-8000, Electronic, PCB Design, Tech-Tips, Constraint Management, CR-8000, CR-8000 Design Force, CR-8000 Tech Tips, Design Verification, High-Current PCB Design, Ohmic Distance, PCB design, PCB Engineering, pcb layout, PCB Trace Resistance, Power Integrity, Signal Integrity, Tech Tips, Blog
Colorful abstract lines and circuit-like paths flowing across a dark digital background.
  • Blog
July 09, 2026
The Power of MBSE Modeling Language Extensibility with CSDL
Digital Engineering, GENESYS, MBSE, CSDL, Digital Thread, FMEA, GENESYS, MBSE, Model-Based Systems Engineering (MBSE), Risk Management, Systems Engineering, systems modeling, traceability, Blog
The ZIW Duck is a prized annual tradition given to those who ask questions and engage with our speakers during sessions.
  • Blog
July 02, 2026
ZIW 2026: Good People, Great Conversations, and One Very Memorable Gong
Americas, Events, ziw, Connected Manufacturing, Customer Stories, Digital Manufacturing, Engineering Community, Panel Builder, ZIW 2026, Zuken Events, Zuken Innovation World, Blog
Modern passenger train with digital engineering overlays, schematics, and connected design data.
  • Blog
June 25, 2026
How Digital Engineering Improves Rail Electrical Design
Digital Engineering, DS-E3, e3-series, Electrical & Wire Harness, Configuration Management, Digital Engineering, Digital Thread, DS-E3, E3.series, Electrical Design, product line engineering, rail electrical design, rail engineering, Transportation, Wire harness design, Blog
Glowing E3 series component database surrounded by electrical parts and circuit symbols.
  • Blog
June 18, 2026
Tech Tip: How to Set Up E3.series Database Configuration
e3-series, Tech-Tips, Database Configuration, E3.series, E3.series Tech Tip, SQL Server, Tech Tips, Blog