Zuken Traditions: The Bristol Office Christmas Challenge, UK

Zuken Traditions: The Bristol Office Christmas Challenge, UK

Menu

British people have a reputation for their quirky sense of humour; while technical folk are known for developing their own brand of amusements. So how would you expect an office full of smart, British technical people to celebrate Christmas? Well, the Bristol Christmas Challenge must be seen to be believed – and perhaps I can inspire you if you need to come up with a festive party game!

Ping-pong balls, high-vis and chopsticks

If you’d visited the Zuken Technology Centre in Bristol on the penultimate Friday before the Christmas break last year, you’d have been met with a baffling sight. In the stationery cupboard someone was up a step ladder, dressed in a hard hat, high-vis jacket, goggles and gloves, changing a light bulb. Nearby, another group transferred coloured ping-pong balls from one desk to another, using chopsticks. In the main meeting room, the senior management team moved erratically around a large table, blowing three festive, helium-filled balloons along as they went. All par for the course for the Bristol Christmas Challenge.

An afternoon of purposeful silliness

BristolChristmasChallenge-GuessingGame-1-300x225

Designed in the 1990s as a shared celebration to counter the slow drift home of staff on the last working days before Christmas, this annual afternoon of purposeful silliness is now in its 29th year.

 

The rules are:

  • Join a team of four and devise a challenge for all the other teams to do.
  • Each challenge must take no longer than three minutes to complete and must involve three people.
  • Challenges must not involve spillable liquids or a computer.
  • Each team must receive a score on completing the challenge.

BristolChristmasChallenge-Socks-1024x771-1-300x226

Over the years, hundreds of challenges have been invented

Common themes include:

Building things – for example, the tallest structure, using, on different occasions, sheets of paper, aluminium foil, paperclips, Lego bricks or marshmallows and raw spaghetti.

Recognising things – countries from just their outlines, Christmas tunes from just their beaten rhythm, company logos only partially visible, or TV theme tunes gargled.

Transferring things – peas using straws (by sucking), ping-pong balls using straws (by blowing), water using thimbles (how did that one get past the organisers?) or, of course, helium-filled balloons.

BristolChristmasChallenge-Straws-1-300x177

There have also been many wilder ideas: travelling around the room riding an office chair train or a trolley-based ‘punt’; moving a rubber band down your head using only facial muscles; making an artwork from fuzzy felt; jousting with cardboard lances on office chair ‘horses’.

There is a trophy and prizes for the team coming up with the most popular challenge of the year. The most favoured ones seem to be those that involve close collaboration, some strategy, and often a physical element – but most of all, that are fun to do. There are also prizes for the team with the most points.

Why has the Christmas Challenge lasted so long?

BristolChristmasChallenge-Ladder-956x1024-1-280x300

Over the years, Zuken UK has been based in towns 40 miles apart, our European HQ has been on two different continents, our name has changed three times, and we’ve had perhaps seven CEOs. The Bristol Christmas Challenge is a tradition that seems to have woven itself into our office DNA.

What’s in it for management? Well, the staff have been known to smile and wink and say ‘team building’. But, of course, that’s exactly what it is. It’s an afternoon of lots of mingling; touring around the building, improving feelings of ownership of all the spaces; intense communication, within and between teams; developing strategies by consensus; adapting those strategies if they prove not to work; continuous collaboration – and a fair bit of innovative thinking.

I think our Christmas Challenge both requires and promotes a positive office culture and a workforce at ease with itself.

What’s in it for staff? Devising the challenges is a challenge in itself, but is often also very satisfying. A common sight at this time of year is a group of people returning from a room somewhere, carrying an assortment of props, smiling and animated, having rehearsed the idea they’ve dreamt up.

And, of course, the afternoon is a lot of fun!

Cass Castello
Cass Castello
A diagram showcasing how the use of PLM can improve functionality, as was the case with Haulotte integrating Zuken's E3.series
  • Blog
February 20, 2024
Delivering on the Promise of Product Lifecycle Management (PLM)

Product Lifecycle Management (PLM) stands as a cornerstone in enhancing product development and operational efficiency, offering a comprehensive approach to navigating the complexities of modern manufacturing. Discover the strategies for effective PLM integration on our blog.

Read now
PLM and MBSE integration
  • Blog
February 13, 2024
Enhancing Mechatronic Product Development by Integrating MBSE and PLM

Product Lifecycle Management (PLM) and Model-Based Systems Engineering (MBSE) are two separate approaches, but they can work together to improve the product development process. Learn how on our blog,

Read now
wp-header-1920x844-control-cabinet-angle-510x310
  • Blog
January 22, 2024
E3.panel Update: Rotating Electrical Components for Enhanced Control Panel Design

For decades 3D has been the state of the art in the world of mechanical design. In electronics and electrical engineering, 2D still holds its own, because here the logical schematic forms the basis for the entire design. The third dimension doesn't come into play until physical design - but 3D is becoming increasingly important there. Find out why on our blog.

Read now
Haulotte's integration of E3.series with ARAS PLM, highlighting improved engineering processes, efficiency, error reduction, and PLM integration, supporting Haulotte's innovation and success in aerial work platforms.
  • Case Study
January 16, 2024
Haulotte

Haulotte's choice of Zuken's E3.series solution has enabled the optimization of work methodology and a more serene and effective projection towards future developments

Read now
The integration of the E3.Series and DS-E3 solutions with the ARAS PLM fully meets the needs expressed by the engineering department at Haulotte.