Reducing Fat Truck Development Time by 75%
Fat Truck is built for places most vehicles cannot go. Behind that capability is a complex electrical and wire-harness process that must remain accurate from design through production.
See how Zeal Motor uses Harness Builder for E3.series to connect design data with wire harness documentation and production, helping the team reduce development time by 75% and cut production preparation time in half.
Watch the Story
In this customer success story, the Zeal Motor team shares how connected electrical design data helps support Fat Truck production as platforms, variants, and customer options continue to grow.
You’ll hear how Zeal Motor moved beyond traditional CAD files, spreadsheets, paper drawings, and manual checks to create a more connected process between engineering and production.
What You’ll Learn
- Why growing harness complexity created challenges for Zeal Motor
- How Harness Builder for E3.series connects design data with production-ready documentation
- How synchronized wire lists and formboard/nailboard data support production
- How Zeal Motor reduced development time by 75%
- Why connected harness data matters as vehicle electrification increases complexity
Featured Results
- 75% reduction in development time
- Production preparation time cut in half
- Updates reduced from hours to minutes
- Assembly errors have been significantly reduced
Download the Success Story
Get the PDF for a closer look at Zeal Motor’s results and how Harness Builder for E3.series supports a more connected process from concept to final vehicle.
Download Zeal Motors Success StoryExplore Harness Builder for E3.series
Harness Builder for E3.series helps manufacturers turn electrical design data into production-ready harness documentation, wire lists, and assembly information.
Explore Harness Builder for E3.seriesRelated Content
Read the behind-the-scenes blog from our visit to Zeal Motor:
Does This Truck Make My Wheels Look Fat? Behind the Scenes at Zeal Motor