Resources by

Stay on the leading edge of PCB, electrical and data management technologies

168 results found
  • Case Study
November 21, 2018
Alstom
Case Study, Alstom, 3rd Party Integration, Increase Productivity, Modular design
Alsthom improves productivity and planning by adopting a modular methodology for electrical design.
  • Press Release
November 20, 2018
CADENAS libraries for E3.series
Press Release, Reduce Your Total Product Cost, Control Quality Through Automation and Verification, Manufacturing and Service Documentation
  • Case Study
September 26, 2018
Renishaw
Case Study, Renishaw, Design Force, E3.series, ECAD/MCAD Integration, Multi-disciplinary collaboration, Increase Productivity, Verification and Validation
Better fit and impedance control for complex flexible PCBs in metrology instruments.
  • Case Study
November 15, 2018
Müller Martini
Case Study, Müller Martini, Increase Productivity, Options and Variants, Multi-site collaboration, ERP/PLM Integration, Modular design, Electro-Mechanical Cabinet Design, Multi-disciplinary collaboration
enhances variant and option handling and reduces manufacturing costs by moving to an object-oriented ECAD environment.
  • Case Study
November 15, 2018
Mecalac
Case Study, Mecalac, E3.3D RoutingBridge, E3.formboard, Special Vehicles, Change management, Product Development Process Reengineering, Multi-disciplinary collaboration
cuts the time taken to develop right-first-time cable harnesses for its heavy plant vehicles.
  • Case Study
November 12, 2018
Pantec Automation
Case Study, Pantec Automation, Increase Productivity, Ensure Your Business Responsiveness, Options and Variants, Modular design, Configuration management, Multi-disciplinary collaboration
cuts machine manufacturing turnaround time by around 50%, reduces product costs, and helps protect IP for its customers.
  • Case Study
  • Download NOW
November 08, 2018
BCA Leisure
Case Study, BCA Leisure, Special Vehicles, ERP/PLM Integration, Multi-disciplinary collaboration, Reduce Your Total Product Cost
Using E3.series to design and manufacture cable harnesses for caravans and motorhomes
  • White Paper
October 22, 2018
Intellectual Property Management
White Paper, DS-CR, DS-2
The dangers of intellectual property theft and how new generation ECAD software can help solve the problem
  • Webinar
October 22, 2018
Best Practices for Using Temporary or Quick Turn Parts
Webinar, DS-CR, DS-2
  • Webinar
October 22, 2018
Get your complexity under control - with Data Management
Webinar, DS-2, DS-E3
  • Webinar
October 22, 2018
Essentials for Successful Multi-Site Design
Webinar, DS-2, CR-8000
  • Webinar
  • Register
October 22, 2018
Transitioning from Architecture Design to Detailed Design
Webinar, System Planner
  • Webinar
October 22, 2018
Creating and Optimizing a Hardware Architecture
Webinar, System Planner
  • Webinar
October 22, 2018
Hardware Architecture Design and Validation
Webinar, System Planner
  • Webinar
October 22, 2018
Protect Your ECAD Library and PCB Design Intellectual Property
Webinar, DS-CR, DS-2
  • Webinar
October 22, 2018
Improve Design Data Security Across Your Enterprise
Webinar, DS-CR, DS-2