Resources by

Stay on the leading edge of PCB, electrical and data management technologies

39 results found
  • Case Study
octobre 04, 2021
INORCOAT

The start-up company INORCOAT relies on Zuken’s E3.series for the development of environmentally friendly nanotechnology coating systems. INORCOAT’s first system was recently put into operation at the Portuguese National Bank for the coating of dies for euro coins.

Read now
  • White Paper
février 09, 2021
Introduction to Model-Based Systems Engineering (MBSE)

Cette introduction au MBSE explique les principes élémentaires du MBSE d'une manière qui sera bénéfique tant aux novices qu'aux experts.

Read now
Un guide pour comprendre les concepts et définitions utilisés dans le Model Based Systems Engineering (MBSE)
  • Case Study
juin 30, 2020
ONTEC

ONTEC faced a difficult challenge: develop a multimedia broadcasting product while complying with a customer’s electromagnetic interference requirements, all within a tight development schedule. ONTEC used Zuken’s CR-8000 with Keysight’s ADS (including SiPro) to meet the requirements of the challenge

Read now
  • Case Study
mars 13, 2020
Hydro-Québec
Case Study, E3.cable
  • Case Study
janvier 14, 2020
dB Broadcast
Case Study
  • Case Study
janvier 14, 2020
Electroflight

As part of the Accelerating the Electrification of Flight (ACCEL) research initiative, Electroflight is aiming to set a new world speed record of more than 300mph for an all-electric aircraft, involving the creation of one of the most power dense flying battery packs in the world.

Read now
  • Case Study
novembre 25, 2019
Testimonials – CR-8000

Un recueil de témoignages de clients CR-8000 satisfaits

Read now
Un recueil de témoignages de clients CR-8000 satisfaits
  • Case Study
novembre 25, 2019
Testimonials – E3.series

Une collection de témoignages de clients satisfaits E3.series

Read now
Une collection de témoignages de clients satisfaits E3.series
  • Case Study
février 15, 2019
Olivetti
Case Study, Olivetti
introduces complex, IoT-enabled products with confidence by switching to CADSTAR
  • Case Study
décembre 19, 2018
Renishaw
Case Study, Renishaw, Design Force, Dessiner et Construire en toute liberté, ECAD/MCAD Integration, Multi-disciplinary collaboration, Augmenter la productivité, Verification and Validation
Better fit and impedance control for complex flexible PCBs in metrology instruments.
  • White Paper
décembre 12, 2018
Report: Design Data Management
White Paper, DS-2, DS-E3, CR-8000
Results of an industry survey of electrical and electronic engineers
  • White Paper
décembre 12, 2018
Domain-specific Data Management
White Paper, DS-2, DS-E3
Why electrical CAD data are best managed in a domain-specific environment
  • White Paper
décembre 11, 2018
From Engineer-to-order to Configure-to-order
White Paper, DS-2, DS-E3
How to evolve into a proactive configure-to-order strategy.
  • White Paper
décembre 11, 2018
Reclaiming Engineering Productivity
White Paper, DS-2, DS-E3
5 easy steps to increasing engineering productivity
  • White Paper
décembre 11, 2018
The Modular Approach – A guide to multi-disciplinary success
White Paper, DS-2, DS-E3
To deliver on the promise of a modular product architecture strategy, companies need to create a number of prerequisites in organization, process and ...
  • Case Study
novembre 22, 2018
Weidmüller
Case Study, Weidmüller, Assurer la réactivité de l’entreprise, Electro-Mechanical Cabinet Design, Gestion de la configuration
Upto 75% reduction in cabinet engineering.