Resources by

Stay on the leading edge of PCB, electrical and data management technologies

18 results found
  • Case Study
octobre 04, 2021
INORCOAT

The start-up company INORCOAT relies on Zuken’s E3.series for the development of environmentally friendly nanotechnology coating systems. INORCOAT’s first system was recently put into operation at the Portuguese National Bank for the coating of dies for euro coins.

Read now
  • Case Study
mars 13, 2020
Hydro-Québec
Case Study, E3.cable
  • Case Study
janvier 14, 2020
Electroflight

As part of the Accelerating the Electrification of Flight (ACCEL) research initiative, Electroflight is aiming to set a new world speed record of more than 300mph for an all-electric aircraft, involving the creation of one of the most power dense flying battery packs in the world.

Read now
  • Case Study
novembre 25, 2019
Testimonials – E3.series

Une collection de témoignages de clients satisfaits E3.series

Read now
Une collection de témoignages de clients satisfaits E3.series
  • Case Study
novembre 22, 2018
Weidmüller
Case Study, Weidmüller, Assurer la réactivité de l’entreprise, Electro-Mechanical Cabinet Design, Gestion de la configuration
Upto 75% reduction in cabinet engineering.
  • Case Study
novembre 22, 2018
Kässbohrer Transport Technik
Case Study, Kässbohrer Transport Technnik, E3.cable, E3.panel, E3.formboard
achieves 60-90% reduction in electrical documentation turnaround for customer specific vehicle configurations
  • Case Study
novembre 22, 2018
Kellenberger
Case Study, Kellenberger, Options and Variants, Manufacturing and Service Documentation
~90% time saving to generate customer-specific schematics by implementing options and variants in E³.series.
  • Case Study
novembre 22, 2018
Bruker
Case Study, Bruker, E3.cable, Multi-disciplinary collaboration, Manufacturing and Service Documentation
raises documentation quality and design flow efficiency for precision instrumentation with E3.series.
  • Case Study
novembre 21, 2018
Stone Aerospace
Case Study, Stone Aerospace, Augmenter la productivité, Réduction du coût total des produits, Contrôle de la qualité par l’automatisation et la vérification
Reduce cabling design time by 12 weeks through using E3.series
  • Case Study
novembre 21, 2018
Emergency One
Case Study, Emergency One, E3.cable, E3.formboard, Wire Harness Engineering, Construction modulaire
controls wire harness design complexity and slashes delivery lead times by using a digital design process.
  • Case Study
novembre 21, 2018
ATK
Case Study, ATK, Augmenter la productivité, Contrôle de la qualité par l’automatisation et la vérification, 3rd Party Integration
increases cable design productivity for space shuttle booster replacement by moving to a digital design process.
  • Case Study
novembre 21, 2018
ARM Automation
Case Study, ARM Automation, Augmenter la productivité, Complexité des produits et des processus
achieves two-thirds electrical design time reduction and increases project ROI.
  • Case Study
novembre 21, 2018
Alstom
Case Study, Alstom, E3.cable, Augmenter la productivité, Construction modulaire
improves productivity and planning by adopting a modular methodology for electrical design.
  • Case Study
novembre 15, 2018
Müller Martini
Case Study, Müller Martini, Augmenter la productivité, Options and Variants, Multi-site collaboration, ERP/PLM Integration, Construction modulaire, Electro-Mechanical Cabinet Design, Multi-disciplinary collaboration
enhances variant and option handling and reduces manufacturing costs by moving to an object-oriented ECAD environment.
  • Case Study
novembre 15, 2018
Mecalac
Case Study, Mecalac, E3.formboard, Wire Harness Engineering, Special Vehicles, Gestion du changement, Restructuration du processus de développement de produits, Multi-disciplinary collaboration
cuts the time taken to develop right-first-time cable harnesses for its heavy plant vehicles.
  • Case Study
novembre 12, 2018
Pantec Automation
Case Study, Pantec Automation, Augmenter la productivité, Assurer la réactivité de l’entreprise, Options and Variants, Construction modulaire, Gestion de la configuration, Multi-disciplinary collaboration
cuts machine manufacturing turnaround time by around 50%, reduces product costs, and helps protect IP for its customers.