{"id":204,"date":"2010-09-20T10:06:09","date_gmt":"2010-09-20T10:06:09","guid":{"rendered":"http:\/\/94.72.213.22\/blog\/?p=204"},"modified":"2023-05-12T11:59:09","modified_gmt":"2023-05-12T15:59:09","slug":"the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1","status":"publish","type":"post","link":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/","title":{"rendered":"The Electrical Engineer: A Piece in the Project Jigsaw (Part 1)"},"content":{"rendered":"<p>But my own personal experience has taught me that it\u2019s not as easy as just telling us engineers to talk to each other more. I\u2019ve also learned that electrical engineers can have a much bigger impact on the whole product development process if we look up from our desktops and see the bigger picture, look at the whole process beyond the immediate tasks of our own design area. And this doesn\u2019t just apply to electrical engineers, it applies to any engineer \u2013 I\u2019m just talking electrical because that\u2019s where my own experience lies.<\/p>\n<div><strong>In this series of posts I\u2019m going to look at the complete product lifecycle<\/strong><\/div>\n<p>As a process from initial sales and negotiation, to system level design, mechanical collaboration, design for manufacture and design for test, through to lifelong maintenance \u2013 and explain how electrical engineers fit into the project jigsaw and how you can increase your influence on the product development process.<\/p>\n<p><strong>Setting the scene<\/strong><\/p>\n<p>No company works in a static void where all the requirements stay constant, there is always someone throwing a spanner (wrench for the Americans) in the works and there are always customers who relish changing their mind \u2013 much to our dismay! \u00a0A quick response is essential to keeping time to market to a minimum, so decisions must be made quickly and should be right-first-time (I feel this phrase is often well over used, but its true \u2013 if you think you have insufficient time to do it right, when will there be enough time to do it all again?)<\/p>\n<p>We\u2019re all familiar with everyone in the product development process cracking on with tasks involved in their specialist area, and once the job is done, passing along \u2013 like pass-the-parcel. Then when required, the process loops back for essential re-work to ensure that the product actually works in the way described, and can be manufactured.<\/p>\n<p>But have you ever thought about making some additional suggestions, asking to be involved at the sales process from the start, recommendations to mechanical engineers etc.? You\u2019d be really surprised by who is willing to listen and what improvements you can take the credit for \u2013 power to the electrical engineer at last!<\/p>\n<p><strong>Starting with sales<\/strong><\/p>\n<p>It\u2019s obvious, but doesn\u2019t always happen \u2013 the fact that departments should have input to the product development sales negotiation process. How many sales people storm ahead and to make a deal without consulting with the people who\u2019ve got to turn this into reality \u2013 argh the arguments this has created!<\/p>\n<p>But the truth is, getting costs accurate is imperative, and this demand requires participation from all aspects of the engineering process at the tender stage.<\/p>\n<p>The sales process is where the majority of a product\u2019s costs are committed. Those not engaging in dialogues with all departments within the company, risk either being late for completion or over budget. And where is the finger pointing when this happens&#8230;right at the product development bods. There is little point making a great sale, if you cannot possibly make the product in the timescale the sales department commit to, and underestimate how much the product will cost to make.<\/p>\n<p>So get in early to keep those sales guys inline!<\/p>\n<p>Join me next time to find out how you as an electrical engineer can positively impact systems engineering. Be sure to come back and see me next week.<\/p>\n<p><span style=\"color: #ffffff;\">CTKN996R879J<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\t\t\t\tBut my own personal experience has taught me that it\u2019s not as easy as just telling us engineers to talk to each other more. I\u2019ve also learned that electrical engineers can have a much bigger impact on the whole product development process if we look up from our desktops and see the bigger picture, look at the whole process beyond the immediate tasks of our own design area. And this doesn\u2019t just apply to electrical engineers, it applies to any engineer \u2013 I\u2019m just talking electrical because that\u2019s where my own experience lies.\t\t<\/p>\n","protected":false},"author":24,"featured_media":14774,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[223,226],"tags":[225,224],"class_list":["post-204","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-wire-harness","category-how-to","tag-electrical-engineer-jigsaw","tag-engineers"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>The Electrical Engineer: A Piece in the Project Jigsaw - Zuken Blog<\/title>\n<meta name=\"description\" content=\"It\u2019s obvious, but doesn\u2019t always happen \u2013 the fact that departments should have input to the product development sales negotiation process. How many sales people storm ahead and to make a deal without consulting with the people who\u2019ve got to turn this into reality \u2013 argh the arguments this has created!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Electrical Engineer: A Piece in the Project Jigsaw (Part 1)\" \/>\n<meta property=\"og:description\" content=\"It\u2019s obvious, but doesn\u2019t always happen \u2013 the fact that departments should have input to the product development sales negotiation process. How many sales people storm ahead and to make a deal without consulting with the people who\u2019ve got to turn this into reality \u2013 argh the arguments this has created!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/\" \/>\n<meta property=\"og:site_name\" content=\"Americas\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/zukenglobal\/\" \/>\n<meta property=\"article:published_time\" content=\"2010-09-20T10:06:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-05-12T15:59:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"727\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jeff Taylor-Jackson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@zukeneurope\" \/>\n<meta name=\"twitter:site\" content=\"@zukeneurope\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jeff Taylor-Jackson\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/\"},\"author\":{\"name\":\"Jeff Taylor-Jackson\",\"@id\":\"https:\/\/www.zuken.com\/us\/#\/schema\/person\/1614bb9834a0279ef47c4bc8c1a85264\"},\"headline\":\"The Electrical Engineer: A Piece in the Project Jigsaw (Part 1)\",\"datePublished\":\"2010-09-20T10:06:09+00:00\",\"dateModified\":\"2023-05-12T15:59:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/\"},\"wordCount\":581,\"publisher\":{\"@id\":\"https:\/\/www.zuken.com\/us\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg\",\"keywords\":[\"Electrical Engineer Jigsaw\",\"Electrical Engineers\"],\"articleSection\":[\"Electrical &amp; Wire Harness\",\"How to...\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/\",\"url\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/\",\"name\":\"The Electrical Engineer: A Piece in the Project Jigsaw - Zuken Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.zuken.com\/us\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg\",\"datePublished\":\"2010-09-20T10:06:09+00:00\",\"dateModified\":\"2023-05-12T15:59:09+00:00\",\"description\":\"It\u2019s obvious, but doesn\u2019t always happen \u2013 the fact that departments should have input to the product development sales negotiation process. How many sales people storm ahead and to make a deal without consulting with the people who\u2019ve got to turn this into reality \u2013 argh the arguments this has created!\",\"breadcrumb\":{\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#primaryimage\",\"url\":\"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg\",\"contentUrl\":\"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg\",\"width\":1500,\"height\":727,\"caption\":\"The Electrical Engineer: A Piece in the Project Jigsaw\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.zuken.com\/us\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Electrical Engineer: A Piece in the Project Jigsaw (Part 1)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.zuken.com\/us\/#website\",\"url\":\"https:\/\/www.zuken.com\/us\/\",\"name\":\"Americas\",\"description\":\"PCB Design, Electrical Design, &amp; Design Data Management\",\"publisher\":{\"@id\":\"https:\/\/www.zuken.com\/us\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.zuken.com\/us\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.zuken.com\/us\/#organization\",\"name\":\"Zuken USA\",\"url\":\"https:\/\/www.zuken.com\/us\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.zuken.com\/us\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2020\/04\/zuken-americas-logo-2.png\",\"contentUrl\":\"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2020\/04\/zuken-americas-logo-2.png\",\"width\":300,\"height\":78,\"caption\":\"Zuken USA\"},\"image\":{\"@id\":\"https:\/\/www.zuken.com\/us\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/zukenglobal\/\",\"https:\/\/x.com\/zukeneurope\",\"https:\/\/www.instagram.com\/zukenglobal\/\",\"https:\/\/www.linkedin.com\/company\/zuken\",\"https:\/\/www.youtube.com\/channel\/UCSvO_Owt3yUMi0PVUqkIO3w\",\"https:\/\/en.wikipedia.org\/wiki\/Zuken\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.zuken.com\/us\/#\/schema\/person\/1614bb9834a0279ef47c4bc8c1a85264\",\"name\":\"Jeff Taylor-Jackson\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.zuken.com\/us\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/db71a7f4be8df18f3cdea3e18ec375314c1cfe87fdd4bbf97f67864e38ba3c80?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/db71a7f4be8df18f3cdea3e18ec375314c1cfe87fdd4bbf97f67864e38ba3c80?s=96&d=blank&r=g\",\"caption\":\"Jeff Taylor-Jackson\"},\"url\":\"https:\/\/www.zuken.com\/us\/blog\/author\/jefftt\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"The Electrical Engineer: A Piece in the Project Jigsaw - Zuken Blog","description":"It\u2019s obvious, but doesn\u2019t always happen \u2013 the fact that departments should have input to the product development sales negotiation process. How many sales people storm ahead and to make a deal without consulting with the people who\u2019ve got to turn this into reality \u2013 argh the arguments this has created!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/","og_locale":"en_US","og_type":"article","og_title":"The Electrical Engineer: A Piece in the Project Jigsaw (Part 1)","og_description":"It\u2019s obvious, but doesn\u2019t always happen \u2013 the fact that departments should have input to the product development sales negotiation process. How many sales people storm ahead and to make a deal without consulting with the people who\u2019ve got to turn this into reality \u2013 argh the arguments this has created!","og_url":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/","og_site_name":"Americas","article_publisher":"https:\/\/www.facebook.com\/zukenglobal\/","article_published_time":"2010-09-20T10:06:09+00:00","article_modified_time":"2023-05-12T15:59:09+00:00","og_image":[{"width":1500,"height":727,"url":"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg","type":"image\/jpeg"}],"author":"Jeff Taylor-Jackson","twitter_card":"summary_large_image","twitter_creator":"@zukeneurope","twitter_site":"@zukeneurope","twitter_misc":{"Written by":"Jeff Taylor-Jackson","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#article","isPartOf":{"@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/"},"author":{"name":"Jeff Taylor-Jackson","@id":"https:\/\/www.zuken.com\/us\/#\/schema\/person\/1614bb9834a0279ef47c4bc8c1a85264"},"headline":"The Electrical Engineer: A Piece in the Project Jigsaw (Part 1)","datePublished":"2010-09-20T10:06:09+00:00","dateModified":"2023-05-12T15:59:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/"},"wordCount":581,"publisher":{"@id":"https:\/\/www.zuken.com\/us\/#organization"},"image":{"@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#primaryimage"},"thumbnailUrl":"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg","keywords":["Electrical Engineer Jigsaw","Electrical Engineers"],"articleSection":["Electrical &amp; Wire Harness","How to..."],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/","url":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/","name":"The Electrical Engineer: A Piece in the Project Jigsaw - Zuken Blog","isPartOf":{"@id":"https:\/\/www.zuken.com\/us\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#primaryimage"},"image":{"@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#primaryimage"},"thumbnailUrl":"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg","datePublished":"2010-09-20T10:06:09+00:00","dateModified":"2023-05-12T15:59:09+00:00","description":"It\u2019s obvious, but doesn\u2019t always happen \u2013 the fact that departments should have input to the product development sales negotiation process. How many sales people storm ahead and to make a deal without consulting with the people who\u2019ve got to turn this into reality \u2013 argh the arguments this has created!","breadcrumb":{"@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#primaryimage","url":"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg","contentUrl":"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2010\/09\/electrical-engineer-puzzle-piece-featured-img.jpg","width":1500,"height":727,"caption":"The Electrical Engineer: A Piece in the Project Jigsaw"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zuken.com\/us\/blog\/the-electrical-engineer-a-piece-in-the-project-jigsaw-part-1\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zuken.com\/us\/"},{"@type":"ListItem","position":2,"name":"The Electrical Engineer: A Piece in the Project Jigsaw (Part 1)"}]},{"@type":"WebSite","@id":"https:\/\/www.zuken.com\/us\/#website","url":"https:\/\/www.zuken.com\/us\/","name":"Americas","description":"PCB Design, Electrical Design, &amp; Design Data Management","publisher":{"@id":"https:\/\/www.zuken.com\/us\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zuken.com\/us\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zuken.com\/us\/#organization","name":"Zuken USA","url":"https:\/\/www.zuken.com\/us\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zuken.com\/us\/#\/schema\/logo\/image\/","url":"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2020\/04\/zuken-americas-logo-2.png","contentUrl":"https:\/\/www.zuken.com\/us\/wp-content\/uploads\/sites\/12\/2020\/04\/zuken-americas-logo-2.png","width":300,"height":78,"caption":"Zuken USA"},"image":{"@id":"https:\/\/www.zuken.com\/us\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/zukenglobal\/","https:\/\/x.com\/zukeneurope","https:\/\/www.instagram.com\/zukenglobal\/","https:\/\/www.linkedin.com\/company\/zuken","https:\/\/www.youtube.com\/channel\/UCSvO_Owt3yUMi0PVUqkIO3w","https:\/\/en.wikipedia.org\/wiki\/Zuken"]},{"@type":"Person","@id":"https:\/\/www.zuken.com\/us\/#\/schema\/person\/1614bb9834a0279ef47c4bc8c1a85264","name":"Jeff Taylor-Jackson","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zuken.com\/us\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/db71a7f4be8df18f3cdea3e18ec375314c1cfe87fdd4bbf97f67864e38ba3c80?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/db71a7f4be8df18f3cdea3e18ec375314c1cfe87fdd4bbf97f67864e38ba3c80?s=96&d=blank&r=g","caption":"Jeff Taylor-Jackson"},"url":"https:\/\/www.zuken.com\/us\/blog\/author\/jefftt\/"}]}},"_links":{"self":[{"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/posts\/204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/comments?post=204"}],"version-history":[{"count":0,"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/posts\/204\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/media\/14774"}],"wp:attachment":[{"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/media?parent=204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/categories?post=204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zuken.com\/us\/wp-json\/wp\/v2\/tags?post=204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}