Resources by

Stay on the leading edge of PCB, electrical and data management technologies

80 results found
DS-CR-PCB-Library-And-Design-Data-Management-481x310
  • Brochure
mars 06, 2019
DS-E3 : Gestion des données de conception de nouvelle génération pour E3.series
Brochure
Z0480-DS-E3-concept-1-510x310
  • Brochure
mars 06, 2019
DS-E3 Overview: Next Generation Design Data Management for E3.series
Brochure
Olivetti 3D IoT Printer, designed using CADSTAR
  • Case Study
février 15, 2019
Olivetti
Case Study, Olivetti
introduces complex, IoT-enabled products with confidence by switching to CADSTAR
RENISHAW-REVO-2_with_RSP3_probe
  • Case Study
décembre 19, 2018
Renishaw
Case Study, Renishaw, Design Force, Dessiner et Construire en toute liberté, ECAD/MCAD Integration, Multi-disciplinary collaboration, Augmenter la productivité, Verification and Validation
Better fit and impedance control for complex flexible PCBs in metrology instruments.
weidmueller-AP_Terminal_Blocks_A_Series_Cross_Connection_1-510x310
  • Case Study
novembre 22, 2018
Weidmüller
Case Study, Weidmüller, Assurer la réactivité de l’entreprise, Electro-Mechanical Cabinet Design, Gestion de la configuration
Upto 75% reduction in cabinet engineering.
Kaessbohrer-Autotransporter
  • Case Study
novembre 22, 2018
Kässbohrer Transport Technik
Case Study, Kässbohrer Transport Technnik, E3.cable, E3.panel, E3.formboard
achieves 60-90% reduction in electrical documentation turnaround for customer specific vehicle configurations
Kellenberger-varia-offen-510x310
  • Case Study
novembre 22, 2018
Kellenberger
Case Study, Kellenberger, Options and Variants, Manufacturing and Service Documentation
~90% time saving to generate customer-specific schematics by implementing options and variants in E³.series.
Bruker-s8-lion-feature-510x310
  • Case Study
novembre 22, 2018
Bruker
Case Study, Bruker, E3.cable, Multi-disciplinary collaboration, Manufacturing and Service Documentation
raises documentation quality and design flow efficiency for precision instrumentation with E3.series.
Stone Aerospace - Testing Autonomous Underwater Vehicle
  • Case Study
novembre 21, 2018
Stone Aerospace
Case Study, Stone Aerospace, Augmenter la productivité, Réduction du coût total des produits, Contrôle de la qualité par l’automatisation et la vérification
Reduce cabling design time by 12 weeks through using E3.series
EmergencyOne-fire-engine-510x310
  • Case Study
novembre 21, 2018
Emergency One
Case Study, Emergency One, E3.cable, E3.formboard, Wire Harness Engineering, Construction modulaire
controls wire harness design complexity and slashes delivery lead times by using a digital design process.
ATK-MCAD2-510x310
  • Case Study
novembre 21, 2018
ATK
Case Study, ATK, Augmenter la productivité, Contrôle de la qualité par l’automatisation et la vérification, 3rd Party Integration
increases cable design productivity for space shuttle booster replacement by moving to a digital design process.
Arm-Automation-Closeup-of-panel-feature-510x310
  • Case Study
novembre 21, 2018
ARM Automation
Case Study, ARM Automation, Augmenter la productivité, Complexité des produits et des processus
achieves two-thirds electrical design time reduction and increases project ROI.
Alstom-CORADIA-Continental-für-Augsburg-510x310
  • Case Study
novembre 21, 2018
Alstom
Case Study, Alstom, E3.cable, Augmenter la productivité, Construction modulaire
improves productivity and planning by adopting a modular methodology for electrical design.
mueller-martini-Alegro_Schrank-510x310
  • Case Study
novembre 15, 2018
Müller Martini
Case Study, Müller Martini, Augmenter la productivité, Options and Variants, Multi-site collaboration, ERP/PLM Integration, Construction modulaire, Electro-Mechanical Cabinet Design, Multi-disciplinary collaboration
enhances variant and option handling and reduces manufacturing costs by moving to an object-oriented ECAD environment.
Mecalac
  • Case Study
novembre 15, 2018
Mecalac
Case Study, Mecalac, E3.formboard, Wire Harness Engineering, Special Vehicles, Gestion du changement, Restructuration du processus de développement de produits, Multi-disciplinary collaboration
cuts the time taken to develop right-first-time cable harnesses for its heavy plant vehicles.
Pantec-RHINO-II-machine-510x310
  • Case Study
novembre 12, 2018
Pantec Automation
Case Study, Pantec Automation, Augmenter la productivité, Assurer la réactivité de l’entreprise, Options and Variants, Construction modulaire, Gestion de la configuration, Multi-disciplinary collaboration
cuts machine manufacturing turnaround time by around 50%, reduces product costs, and helps protect IP for its customers.