Tech-Tip: Setting a temporary grid in Design Force

Menu

Offsetting your Grid can be very useful when your component pads do not fall on the current Grid.

This can be done by using a Macro command “( settemporarygrid setpitch inputbasepoint”.  Enter the command in the Macro command window select Start Playback then select any pad from the component.  This will move your grid to the center of the pads.

When finished you can then release the Temporary Grid by selecting Clear Temporary Grid from the Grid menu.

Brian Gilman
Brian Gilman
Applications Engineer
Brian Gilman is an applications angineer, supporting customers with CR-8000/CR-5000 training and consulting. He works directly with the customers on a daily basis helping them work through the technical challenges they face. He loves to ski and must be on the first chairlift in the morning to lay down the first tracks on fresh powder.
  • Blog
November 05, 2020
Printed circuit board shot into space

Since 2012, the FED has been honoring outstanding designers with the PCB design award. One of this year's winning designs was even into space.

Read now
  • Blog
September 29, 2020
Tech Tip: How to Register a Command for the Tool List in CR-8000 Engineering Desktop

Many Designers are always asking Zuken how they can create their own user commands that will appear in the Tool List when doing a Right Mouse Button Click on a design under settings in the Engineering Desktop. User commands can be created and listed. This can be accomplished with minimal effort. It will be the designer’s responsibility to create a script that will be listed on the tool list.

Read now
  • Webinar
September 14, 2020
EMC for PCB Designers

In this presentation, an EMC minded PCB design approach is presented, allowing designers to understand which EMC rules will apply to PCB projects and how EMC analysis capabilities can be utilized in the CAD flow to reduce the risk of EMC compliance failure once the board is manufactured.

Read now
  • Blog
September 10, 2020
Powerful SI/PI/EMI PCB Simulation Environment Reduces Analysis Time by 86%

What do you do if your next project is high speed, with exceptionally stringent EMI requirements, and has to be complete in less time than you’ve ever developed a product before? When the Ontec team found themselves facing that predicament, they turned to Zuken. Why?

Read now