Resources by

Stay on the leading edge of PCB, electrical and data management technologies

22 results found
Haulotte's integration of E3.series with ARAS PLM, highlighting improved engineering processes, efficiency, error reduction, and PLM integration, supporting Haulotte's innovation and success in aerial work platforms.
  • Case Study
January 16, 2024
Haulotte

Haulotte's choice of Zuken's E3.series solution has enabled the optimization of work methodology and a more serene and effective projection towards future developments

Read now
The integration of the E3.Series and DS-E3 solutions with the ARAS PLM fully meets the needs expressed by the engineering department at Haulotte.
GREENGT_car_racetrack_header-510x310
  • Case Study
October 12, 2023
GreenGT

Using Zuken's E3.series, Green GT reduces the development time of its prototypes for fuel cell systems and high-performance hydrogen vehicles.

Read now
Integrating electronic design environment within the company's PDM infrastructure.
KTM-mh-engineering-300x214-1
  • Case Study
April 17, 2023
M-H engineering
Case Study
WH_optimex_ffs_3840x2880_r_stage_master-1510x731-1-510x310
  • Case Study
February 10, 2023
Windmöller & Hölscher

Data conversion as a foundation for a future-oriented development process in electrical and pneumatic control technology. Zuken Migration Services converts 18,000 data records for Windmöller & Hölscher, the world market leader in machines and systems for manufacturing and processing flexible packaging.

Read now
Migrating 30 years of legacy data to Zuken E3.series via Zuken’s data migration services
A set of three green and white high-tech coating machines from Inorcoat, designed for environmentally friendly production that is affordable
  • Case Study
October 04, 2021
INORCOAT

The start-up company INORCOAT relies on Zuken’s E3.series for the development of environmentally friendly nanotechnology coating systems. INORCOAT’s first system was recently put into operation at the Portuguese National Bank for the coating of dies for euro coins.

Read now
Making environmentally friendly coating technology affordable
Hydro-Québec power distribution
  • Case Study
March 13, 2020
Hydro-Québec

Hydro-Québec simplified design process for power distribution network substations by implementing Zuken’s E3.series

Read now
Improves Power Distribution Substation Design Productivity by 100%
Testimonials
  • Case Study
November 22, 2019
Testimonials – E3.series

A collection of testimonials from satisfied E3.series customers

Read now
A collection of testimonials from satisfied E3.series customers
Electroflight - E3.series customer
  • Case Study
November 07, 2019
Electroflight

As part of the Accelerating the Electrification of Flight (ACCEL) research initiative, Electroflight is aiming to set a new world speed record of more than 300mph for an all-electric aircraft, involving the creation of one of the most power dense flying battery packs in the world.

Read now
To support an ambitious technology roadmap, Electroflight selected Zuken’s E3.series to create electrical and fluid schematics for the ACCEL speed r...
Smart Cabinet Building Initiative – Staying Competitive in a Global Market
  • Case Study
November 22, 2018
Weidmüller

The Weidmüller Configurator (WMC) developed in a three-year collaboration with Zuken, alongside the Klippon Connect® series of terminal blocks. can streamline the process of selecting, planning and ordering terminal rail components enhancing the efficiency in the engineering process by up to 75%.

Read now
Upto 75% reduction in cabinet engineering.
Kaessbohrer-Autotransporter
  • Case Study
November 22, 2018
Kässbohrer Transport Technik

The Austrian manufacturer of vehicle Transporters, Kässbohrer Transport Technik, achieved a substantial improvement in process reliability in the generation of individualized assembly instructions and schematic documentation by implementing E3.series. Turnaround cycles for special projects were reduced by 60 to 90%.

Read now
achieves 60-90% reduction in electrical documentation turnaround for customer specific vehicle configurations
Kellenberger-varia-offen-510x310
  • Case Study
November 22, 2018
Kellenberger

Kellenberger develops and produces numerically-controlled precision grinding machines and systems for sectors such as automotive, medical devices and industrial machinery. The Swiss-based manufacturer recently introduced Zuken’s E3.series to automate the generation of schematics for customer-specific machine configurations, cutting the time taken by more than 90%.

Read now
~90% time saving to generate customer-specific schematics by implementing options and variants in E³.series.
Bruker-s8-lion-feature-510x310
  • Case Study
November 22, 2018
Bruker

To improve the quality of its electrical documents such as wiring diagrams, and to raise its design efficiency, Bruker AXS GmbH Karlsruhe implemented Zuken’s E3.series at all stages. The manufacturer of X-ray analysis systems uses E3.series from concept and production to service.

Read now
raises documentation quality and design flow efficiency for precision instrumentation with E3.series.
Stone Aerospace - Testing Autonomous Underwater Vehicle
  • Case Study
November 21, 2018
Stone Aerospace

Stone Aerospace faced the pressure of a tight schedule in designing a one-of-a-kind underwater autonomous vehicle (AUV). The time needed to design the wiring harness for the AUV was reduced by around 12 weeks and $20,000 was saved by using E3.series to automate many aspects of the design process, while integrating the logical and physical design on a single platform.

Read now
Reduce cabling design time by 12 weeks through using E3.series
EmergencyOne-fire-engine-510x310
  • Case Study
November 21, 2018
Emergency One

Specialist fire rescue and emergency vehicle manufacturer, Emergency One UK Ltd, uses E3.series software for its electrical harness design. This has enabled the company to produce wire harnesses to standardize the design and manufacturing process reaping, cost savings and reliability benefits, while also delivering flexibility through modular based customization.

Read now
controls wire harness design complexity and slashes delivery lead times by using a digital design process.
ATK-MCAD2-510x310
  • Case Study
November 21, 2018
ATK

ATK was tasked by NASA with designing the wiring harnesses for the booster rockets powering the replacement for the Space Shuttle while employing a team that is significantly smaller than that used on the now-cancelled Ares I project. ATK accomplished its mission by using E3.series to substantially increase productivity, while eliminating the need for a physical mock-up and costly test lab.

Read now
increases cable design productivity for space shuttle booster replacement by moving to a digital design process.
Arm-Automation-Closeup-of-panel-feature-510x310
  • Case Study
November 21, 2018
ARM Automation

ARM Automation designs, builds and supports custom automated manufacturing systems for a wide range of industries. The electrical design of these systems can be complex, running up to several hundred drawing sheets. Using E3.series intelligent schematics to drive the electrical design process, the company has reduced their development time by two-thirds.

Read now
achieves two-thirds electrical design time reduction and increases project ROI.